Project Components

Kaizen and Lean end-to-end transformation for Farm Superstores across 90 branches and central operations in Dammam and Jeddah. Scope covered current-state assessment, visual management with daily Kaizen boards, KPI design, branch profitability analysis, warehouse standards using Collaborative Planning, Forecasting & Replenishment (CPFR), standard work, 5S and ABC, backhaul optimization, and training on value stream mapping and statistical problem solving.

A. The Challenge: Disparate practices across 90 branches, inconsistent replenishment and sales methods, warehouse waste, and limited visual management and KPIs hindered performance, logistics efficiency, and data-driven decisions across Dammam and Jeddah operations.

B. Our Solution: Delivered current-state study; KPI design with daily Kaizen boards; Collaborative Planning, Forecasting & Replenishment (CPFR), mizusumashi, and standard work; applied 5S and ABC; optimized backhaul; trained teams in value stream mapping and problem solving.

C. Key Achievements: Implemented visual boards and KPIs across 90 branches; set CPFR and mizusumashi replenishment; standardized sales work; evaluated 5S and ran ABC at the central factory; optimized backhaul to cut costs; strengthened capabilities through targeted training.

Project Overview

Kaizen-led retail transformation across 90 branches, standardizing replenishment and sales work, cutting warehouse waste, optimizing backhaul, and training teams on Value Stream Mapping and statistical problem-solving.

Client:

Saudi Marketing Company (Farm Superstores)

Value:

900,000 SAR

Start Date:

2020

End Date:

2021

Project Category:

Quality and Institutional Excellence

Project Tag:

Industry

Duration:

Six months

Project URL:

farm.com.sa

Status:

Completed

Rating:

5.0 rating

The Client Phone :

+966 13 853 5800

The Client Email :

info@farm.com.sa

The Client Website :

farm.com.sa